Production Schedule flags are:

 

pic0001c Blue: Active

pic0001d Red: Material Cost included

pic0001e Green: Program Stone (this status should marry with the program stone status of the project to which the schedule is assigned).

pic0001f Maroon: Production Schedule is complete.