Delete Multiple (unrequired) Cost Codes

Cost Monitor projects can be created by estimate import or default project creation. In either case, the project may be left with cost codes which have no original value and no prospect of being used for orders.

In other cases, cost codes previously inserted may no longer be required.

The procedure shown above is a quick an easy way to remove these unrequired cost codes.